Retail pharmacy overcomes loadshedding with energy solution
Our Sustainable Buildings team strikes again in the battle against loadshedding, watt by watt!
When this retail pharmacy chain in Cape Town asked for a reliable power solution for stage 8 loadshedding, we supplied a mighty 50kW 3 phase Deye inverter paired with an impressive 143kWh of WeCo batteries, to ensure that it’s business as usual 100% of the time.
View our solar and BESS solutions.